Designing a dike which is able to withstand earthquakes is a considerable challenge. As the earth shakes, sand layers under the quay may weaken and lose their rigidity. What made i [ ... ]
Read moreCase studies
Antea Group carried out all the engineering work for this project to come up with a final design and execution design: the design of the concrete constructions in the u [ ... ]
Read moreReady availability of wind and space have made Dronten one of the Netherlands' go-to municipalities for wind power. Both the national government and private-sector parties have the [ ... ]
Read moreThe Netherlands is going for sustainably generated power. As part of this sustainable power drive, plans were unveiled for two wind farms with a total capacity of 600MW in the Ems [ ... ]
Read moreIn the Noordoostpolder municipality, one resident has been complaining about the noise produced by wind turbines for around fifteen years. Over those fifteen years, there has been [ ... ]
Read more"More power through fewer turbines in a more attractive landscape" is the challenge set by the ambitious Wieringermeer Wind Plan. Together with the association of wind turbine owne [ ... ]
Read moreA project developer in the field of wind power has asked us to take care of the environmental impact assessment and spatial justification for two sites in the Port of Rotterdam. Th [ ... ]
Read moreThese three organizations represent the interests of people (local residents), planet (nature and the environment), and profit (wind turbine owners). The challenge is to build brid [ ... ]
Read moreThe province intends to hand permit granting competency over to the Binnenmaas municipality, provided they are willing to collaborate on the project. The municipal authority now ha [ ... ]
Read moreMaking life easier for the people of the 400-home luxury villa estate of Makkum Beach by taking care of all site management and maintenance — that is what Antea Group was commiss [ ... ]
Read more